Importing Plant Extracts from China: MOQ, Lead Time, Incoterms and Documents

Importing plant extracts from China is straightforward when the enquiry is precise. Delays usually come from an incomplete RFQ, a specification that changes after the order, or document mismatches at customs. This guide sets out the commercial and logistical sequence we recommend to first-time buyers.

Key takeaways
  • Put grade, assay method and destination market in the first enquiry.
  • Separate sample, pilot and production lead times.
  • Choose the Incoterm before comparing prices.
  • Reconcile every document to the same batch number.

1. Build a complete RFQ

  • Ingredient name, Latin binomial and plant part.
  • Grade (food / supplement / cosmetic / feed), target marker and acceptance range.
  • Assay method, carrier preference, mesh and packaging.
  • Quantity, target price range, destination port/country and required delivery date.
  • Documentation: COA, MSDS, origin, allergen, non-GMO, and any market-specific declarations.
  • Whether a pre-shipment sample and third-party inspection are required.

You can use our Request a Quote form — it collects exactly these fields.

2. Samples, MOQ and lead time

StageTypical purposeWhat to confirm
Sample (1 kg or less)Formulation and assay verificationSame specification as the production lot
Pilot lot (5–25 kg)Process trial, stability startBatch COA and retention sample
Production lotCommercial supplyPre-shipment sample, packing list, documents

Lead time depends on raw-material availability and whether the grade is a stock item or a custom extraction. Ask for a written breakdown of production, testing and booking time rather than a single delivery promise.

3. Incoterms and landed cost

Under Incoterms 2020, FOB places export clearance and loading with the seller and main carriage with the buyer; CIF adds carriage and minimum insurance to the seller’s side; DAP moves delivery closer to the buyer’s premises. Compare offers on the same term, and remember to add freight, insurance, duty, customs clearance, inland delivery and any inspection fees to the landed cost.

4. Shipping documents

  • Commercial invoice and packing list with consistent descriptions and weights.
  • Bill of lading or airway bill, certificate of origin where required.
  • Batch COA, MSDS/SDS, specification sheet and any declarations agreed in the RFQ.
  • Phytosanitary or other certificates where the destination authority requires them for plant material.

5. Receiving and release

On arrival, check seal integrity and pallet condition, reconcile the batch numbers on the drums with the COA and packing list, and run your incoming-goods tests against the agreed specification before release. Keep the retention sample and the COA together for traceability.

For a broader supplier-qualification view, read our supplier audit checklist, or contact our team with your destination market and required documents.

Frequently asked questions

What is the smallest order we can place?

Sample quantities start at 1 kg for most catalogue items; commercial MOQ varies by grade and extraction route. State your intended annual volume so the quotation reflects the right tier.

Which Incoterm should a first-time importer choose?

Many start with CIF or FOB to a familiar port, then move to DAP once the lane and broker are established. Choose the term that matches who controls freight and customs.

Do we need a phytosanitary certificate for a plant extract?

Requirements vary by destination and by how the material is classified. Confirm with your customs broker before shipment, not after booking.

Can documents be issued in our own template?

Usually the core COA follows the producer’s format, but additional declarations and a customer-specific packing list can normally be prepared if agreed in the RFQ.

Need the documentation for your project?

Tell us the ingredient, target specification, quantity and destination market. Our team will send a specification sheet, COA sample and a quotation within 24 hours on working days.

Request a Quote Browse Products

Related topic: quotations with Incoterms and document packages

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top